![]() | |
Fun in the Sun since 1999 | Your browser can't find the .css style script |
Home | Toys | Summers | Contacts | Links | About Us |
![]() |
Saturday August 22nd. Time for some plumbing work.
The waste pipe was near grade and our plan was to move the toilet, so out comes the old pipe. |
That big tree had roots everywhere! | ![]() |
![]() |
Finally, everything cut out, and the wall opening ready for the new pipe |
Almost ready, a few more roots | ![]() |
![]() |
How's that for a twisted mess of pipe. |
A nice straight section of pipe will replace that mess. | ![]() |
![]() |
That's it, we're connected again. |
Back to the interior. We'll start at the highest point, the kitchen. | ![]() |
![]() |
Carol cutting pipe. |
The kitchen vent heads over to the bath area | ![]() |
![]() |
Vanity, toilet, and tub drains set. |
That's it, the waste pipes are done! | ![]() |
![]() |
We decided to try PEX tubing for the water.
I kinda like it. We ran 2 long runs under the floor, and just tapped in where we needed water. |
A few taps for the vanity and toilet. | ![]() |
![]() |
And the tub connections too. |
A quick pressure test, and nothing leaks! | ![]() |
![]() |
Our old well doesn't seem to work? It was rumored we shared a well with a neighbor.
A few minutes of digging proved that false, and we have our very own PLUGGED WELL POINT! |
I found the well, and the water is about 6 feet from the TOP of the well pipe, not good.
We finally got it going, read the story below |
![]() |
Our well story coing soon! |