Preserving our Natural Resources since 1997 | Your browser can't find the .css style script |
Home | Equipment | Projects | Contacts | Links | About Us |
July 2nd, 2005: The boys find another choice spot for their third tree house.
I hear rumors this one is to be a 2 floor hybrid style. The "hybrid" means part tree, part post supported. |
|
Construction begins a bit slow, it takes time to get things lined up and level. | |
A ladder needs to be built to get to the floor joists.
The next day it rained, that means we have to get back some other day to finish it up! |
|
Over the Labor Day holiday the boys finished up the first floor.
Ryan, Mike and Matt got going, and are headed skyward with the second floor. |
|
back to the top |