Saturday, October 3rd. COld weather is coming! The floor under the old closet are was rotten from a roof leak. We'll cut that out and replace it. |
| We need to set the tub too. We sectioned the floor so we could install and test the drain from above. | ![]() |
![]() |
Cool, the tub is set, and the drain works. |
| The rest of the floor can go down, and the shower wall need to be built | ![]() |
![]() |
Sunday, the rough wiring is in, and the wall insulation went up in a flash! |
| We're almost ready for tht drywall! | ![]() |
![]() |
That's messy, we had better wire that up before the drywall starts. |
|
Thursday October 15th, we're back for more!
I had a nightmare about the roof collapsing on me. I decided to shore up the saggy ceiling with a few more 2x6s. |
![]() |
![]() |
That's better, the ceiling line is straight now!
Up goes the 10 foot sections of 5/8" drywall, I'm glad I have a lift! |
| It's going good! | ![]() |
![]() |
Almost done with this room |
| Bedroom | ![]() |
![]() |
Bathroom, hey we cleaned up the wiring too!
The ceiling is done! |
| Saturday, before load the floor with more drywall, I want to shore up the center. | ![]() |
![]() |
That's better, the floor had an annoying bounce. |
| First up, tile backer in the bathroom. | ![]() |
![]() |
Done! |
| Let's add some blocking for the towel bars. | ![]() |
![]() |
Now let's get started on the walls |
| Going well | ![]() |
![]() |
Sunday, kitchen time.
That's it for now, time to go home again. I have all of the 8 and 10 foot sections hung, I need some help with the 12 footers! |
|
Saturday October 24th. Carol and I hang the last of the 12 footers, now it's time for some tape.
The cold car fogged up the camera |
![]() |
![]() |
Not my favorite part, but it has to be done (and within budget too!) |
| Sunday morning, is it time to go home yet? | ![]() |
![]() |
Saturday Nov 8th. We're back at it again. |
| It really doesn't look any different? | ![]() |
![]() |
We did sand everything, and we're ready for a top coat.
It's up to 60 degrees this weekend, that sure is nice to have the doors open! |
| Our insurance agent told us we needed some stairs until the deck goes in. We whipped up quick set from the leftover barn wood. |
![]() |
![]() |
Maybe the hallway isn't as far along as I had hoped. |
| The attic scuttle needs some attention too. |
![]() |
![]() |
Friday Nov 13th. We're back at it again!
We need to finish the closet framing and get some primer on this place! |
| Closets framed and the primer has started |
![]() |
![]() |
bedrooms done! |
| Now for some final touches on the ceiling |
![]() |
![]() |
The skylight gets primed first |
| Carol cuts in the corners while I roll the flat areas |
![]() |
![]() |
About half way done |
|
Monday afternoon and we're done, cleaned up and ready to go home!
We brought the flooring in from the barn |
![]() |